The Canadian Transportation Alliance examined Canada's path to net-zero emissions in their study, “Embracing Canada’s Low-Carbon On-Road Transportation Opportunity".
Electric delivery vans rolled hot off the production line recently as
The small town in Oxford County, a 30-minute drive west of London, in southwestern Ontario, is home to the
Introducing BTC POWER’s Gen4 180kW All-in-One DC Fast Charger for Electric Vehicles. Featuring optional liquid cooled cables, the 180KW can provide 80% battery charge in as little as 12.5 minutes, offering the ability to service more customers.
Customers can’t say enough good things about Easy Flow On Tap. Not only is it convenient and easy to use, but people love that it’s better for the environment.